Images for the section

Latest news

24.01.2012
Cubicle switchboard “KRU-IE”, low voltage distribution switchgear “NKU SE IE” and one-side operated cabinets “KSO-IE” produced by INVENT-Electro have passed all qualification and certification tests and were certified for use at the facilities of the Federal Grid Company.

read more
28.10.2011
The visit took place within the official trip of the management of the Russian Energy Agency (REA) to Kazan. The government of the Republic of Tatarstan and Russian Energy Agency signed a cooperation agreement which contemplates cooperation in the sphere of improvement of energy efficiency and innovative activities in...
read more
4.10.2011
According to the results of annual research by rating agency Expert RA, INVENT group is in the list of the largest Russian companies

read more
Heating grids

 

Total construction (reconstruction) cycle of:

  • hot water systems;
  • heating systems with vapour pressure of up to 140 at;
  • heating systems with pipeline diameter of up to 1220 mm (including FPU), includes design, supply of materials and machinery, construction and start-up works.

CHP (Combined Heat Power Plant) reconstruction works (including installation and erection of equipment, metering stations, stop valves, steam pipelines, etc.) are also carried out.

The most important stage of construction of any facility is its foundation - the basis of the whole structure, ratio of reliability and life. During foundation all factors are considered (from designation to soil type). During fabrication and erection of metalware (frame) with subsequent laying of pipelines with various length, up-to-date technologies and materials are used, which make it possible to reduce nonmanufacturing heat losses and solve a range of priority problems of energy resource efficiency.

 


Contacts:

81 Tetsevskaya st, Kazan, Republic of Tatarstan, 420051
Tel.: (843) 249-23-20
Fax: (843) 249-23-36
E-mail: its@inventunion.ru