Images for the section

Latest news

24.01.2012
Cubicle switchboard “KRU-IE”, low voltage distribution switchgear “NKU SE IE” and one-side operated cabinets “KSO-IE” produced by INVENT-Electro have passed all qualification and certification tests and were certified for use at the facilities of the Federal Grid Company.

read more
28.10.2011
The visit took place within the official trip of the management of the Russian Energy Agency (REA) to Kazan. The government of the Republic of Tatarstan and Russian Energy Agency signed a cooperation agreement which contemplates cooperation in the sphere of improvement of energy efficiency and innovative activities in...
read more
4.10.2011
According to the results of annual research by rating agency Expert RA, INVENT group is in the list of the largest Russian companies

read more
Overhead transmission lines, cables lines, power stations and substations

 

PL (Power Lines) Construction and reconstruction

 

Overhead power lines are currently the most popular method of electric power transmission to the consumer. PL construction is a rigorously verified process including:

1.     Land topographical survey (pattern of available pipelines, buildings, facilities, natural landscape, etc. of the facility under examination)
2.     Preliminary approval procedure
3.     Site surveying (soil sampling for further determination of foundation type and mark)
4.     Design (development of highway passing variants, selection of type and mark of foundations, supports, wires. Load computations. Selection of RZiA (Relay protection and automation) equipment)
5.     Preparation of working documentation
6.     Delivery of necessary materials and equipment
7.     Construction and erection works, including:

  • Sub-support layout
  • Trench excavation
  • Foundation arrangement (in accordance with project decision)
  • Refilling of trench (in accordance with of design institute decision)
  • Supports delivery to the site, assembly
  • Installation of support
  • Installation of pendant fittings, insulators and wiring
  • Start-up works
  • Site improvement
  • Commissioning of the facility subject to inspection board's approval 

 

Cable lines. Construction and reconstruction

Gradually conventional overhead power lines are superseded by cable lines due to greater functionality of the latter. Lines being laid in aesthetic way (underground and submerged laying along the facilities) considerably improve energy safety, for they are less exposed to natural phenomena.

Preparatory cable line construction stages are similar to those of overhead PL. Technological peculiarities of construction and erection works during cable route construction assume creation of cable facilities of different types using trays with cable inside. This technology is applied for up-to-date megapolises (space saving) and conservation areas (conservation of landscape). 

 

Electric power stations and substations. Construction and reconstruction

In up-to-date power supply systems substation is a primary supplying centre of power facilities. Maximum reliability and safety level is reached not only due to well-developed power technologies market, but also due to professional approach to construction of the building itself.

Construction and erection of substations is carried out at the operational location with strict observance of all stages:

1.     Allocation of land for construction;
2.     Preparation of the ground;
3.     Designing;
4.     Equipment delivery to the facility;
5.     Installation of equipment;
6.     Start-up works;
7.     Commissioning of the facility.


Contacts:

81 Tetsevskaya st, Kazan, Republic of Tatarstan, 420051
Tel.: (843) 249-23-20
Fax: (843) 249-23-36
E-mail: its@inventunion.ru