Total construction (reconstruction) cycle of:
- hot water systems;
- heating systems with vapour pressure of up to 140 at;
- heating systems with pipeline diameter of up to 1220 mm (including FPU), includes design, supply of materials and machinery, construction and start-up works.
CHP (Combined Heat Power Plant) reconstruction works (including installation and erection of equipment, metering stations, stop valves, steam pipelines, etc.) are also carried out.
The most important stage of construction of any facility is its foundation - the basis of the whole structure, ratio of reliability and life. During foundation all factors are considered (from designation to soil type). During fabrication and erection of metalware (frame) with subsequent laying of pipelines with various length, up-to-date technologies and materials are used, which make it possible to reduce nonmanufacturing heat losses and solve a range of priority problems of energy resource efficiency.
Contacts:81 Tetsevskaya st, Kazan, Republic of Tatarstan, 420051
Tel.: (843) 249-23-20
Fax: (843) 249-23-36
E-mail: its@inventunion.ru